Control valve installation precautions

1. Control valve should be installed before the pipeline dirt, rust grease and slag, etc. to be cleaned; after installation, the valve should be at the maximum opening of the pipeline, the valve to clean and test the sealing of the joints, so as to avoid Slipping phenomenon occurs during operation or damaged spool, seat. 2. Should be installed near the ground or floor to facilitate maintenance and repair; for semi-valve with a valve positioner or hand wheel mechanism, should ensure that the observation, adjustment and operation of the convenience. 3. During installation, the direction of the medium should be the same as the arrow on the valve body. 4 installation should avoid additional stress to the control valve, so as to avoid the temperature or weight of the valve flange deformation and damage, when the valve is installed in the pipe longer place, should be installed support frame, especially in the use of Vigorous occasions must be supported or take appropriate vibration isolation measures. Large-diameter control valve should be installed to avoid tilt, to prevent the valve trim mechanical wear and packing leakage, which should pay special attention. 5. For safety reasons, the pneumatic control valve should be added bypass pipeline (important occasions), in order to control valve failure or maintenance, will not stop production. 6. With handwheel mechanism, the valve can be manually operated, but also can be used to limit the valve opening. In the use of automatic control, the hand wheel mechanism must be placed in neutral position. 7. For high temperature valves, greasing should be applied to the packing section every three months. 【Print】 【Close】