No-load trial operation of the compressor

(1) Preparation work. The compressor installation work is completed, the delivery documents are complete, the operation site is clean and tidy, and it meets the special requirements and safety regulations. Check the tightening of each part of the compressor; check the positioning, anti-loose, clearance and braking reliability; check the connection parts, remove the intake and exhaust valves, install the safety filter valve; check the connection parts of the motor and compressor And the locking device is tightened and locked. After the car is not abnormal. For piston compressors, it is important to note that the pistons at each stage should not be at the front and rear dead points.
(2) No-load test run. Turn on the cooling water system and the circulating oil system (with forced air to open the fan) and debug it normally. Start the motor instantaneously according to the electrical operation rules, check whether the moving parts of the motor and compressor are abnormal, and check whether the sound, temperature, vibration and speed of each part are abnormal. No abnormality can be continuously operated for 8h~12h. Its oil pressure, bearing temperature rise and metal packing temperature should reach the range of required control.

Bathtub/SPA

Baby Bath Tub,Inflatable Bath Tub,Swimming Pool Spa,Baby Bath Tub Foldable

P&D Plastic Manufacture Co., Ltd , https://www.jmInflatableboat.com